Loading of labs on Oden

Mobilization week continued through the first week of June and into the weekend. A high point of the loading after Oden got out of the dry dock was the lifting on board of the new main aerosol lab that was built for ASCOS to go on the 4th deck of Oden. Main aerosol lab being loadedMain aerosol lab being loaded

Containers on the main deck lab-roof was also loaded and as was lots of equipment to the 7th top deck, on the bridge roof, making use of the reach of the large cranes in the shipyard.449 MHz wind profiler449 MHz wind profiler